StoryNote
Log in
|
Sign up
/r/u_8Throttles
Year:
All
2024
Show search filters
Search by title:
Search by author:
Hide posts already read
Only show posts with narrations
If you 100 hr is tied to an approved phase mx schedule then you would need the SFP as there is no overfly permitted for those of us on phased mx (my school, for example, is a 50 hr phase with elements of the hundred spread out).
1 upvotes
•
8Throttles
Mark as read:
--
10
9
8
7
6
5
4
3
2
1
0
Add to a list
Title
Upvotes
Author
Mark as read
Favorited
Rating
Add to a list
If you 100 hr is tied to an approved phase mx schedule then you would need the SFP as there is no overfly permitted for those of us on phased mx (my school, for example, is a 50 hr phase with elements of the hundred spread out).
1
8Throttles
--
10
9
8
7
6
5
4
3
2
1
0
«
<
>
»
Page
of 1
Go