/u/plumber5078's posts
After adding shims for the studs to be on the same plane, the cement board is no longer on the same plane as the adjacent drywall. Is this okay? Also, after adding 1-inch shims, the 1-5/8 inch cement board screws are now too short to reach the studs. What else can I use?
Mark as read: Add to a list
Mark as read: Add to a list